Settlement of buildings
Contents |
[edit] Introduction
Settlement is the downward movement of the ground caused by a load consolidating the soil below it or causing displacement of the soil. Settlement often refers to the downward movement of the ground around an excavated space, such as that for tunnels, shafts, or basements.
It is usual for buildings to experience some degree of settlement within the first few years after construction. Although the extent to which this ground movement impacts upon buildings depends on several factors, which may include:
- Existing soil conditions.
- Methods of construction.
- Size and depth of the construction works.
- Type of structure, its condition, and its foundations.
The impact of settlement is opposite to the effect of heave which is the upward movement of the ground, and is different from subsidence which occurs where soil is unstable and sinks downward without any imposed load.
[edit] Causes of settlement
Typically, settlement occurs within the foundation soils that surround and support the structure.
The more common causes of settlement include:
[edit] Weak bearing soils
Where soils are not capable of supporting the weight or bearing pressure exerted by a building’s foundation. This can occur when foundations are designed based upon general guidelines rather than site-specific soil information, such as in the case of some residential construction projects.
[edit] Poor compaction
The leveling of a site prior to foundations being constructed often relies upon the placement of fill soils. Often these are imported from off-site locations and unless they are properly placed and compacted, may compress under loading and result in settlement of the structure.
[edit] Changes in moisture content
The soil’s ability to support the load of a foundation settlement may be reduced by changes in moisture content within the soil. If soils are saturated, clays and silts may be softened. If soils are dried-out they have a tendency to shrink or contract.
[edit] Maturing trees and vegetation
Therefore, a common cause of settlement is root systems expanding from maturing trees and vegetation and drawing soil moisture from beneath a structure. A general rule is that the diameter of a tree’s root system is at least as large as its canopy.
[edit] Soil consolidation
Applied loads force water out of clay soils which compress and result in downward movement or settlement of overlying structures. Settlement caused by consolidation may take a considerable amount of time to be ‘complete’.
[edit] Signs of settlement
In cases of minor settlement, which could be due to cyclic or seasonal movement, small hairline cracks may appear in plaster. In more serious cases, doors and windows may develop sticking problems, and plumbing and mechanical equipment may be adversely affected.
It is rare for settlement to affect the structure of the building. Whilst situations vary from site to site, a general rule is that a crack is considered to be of a structural nature if it approaches or exceeds a width of one-quarter inch.
[edit] Responding to settlement
There are certain steps that may be taken to prepare for, and respond adequately to, settlement:
- Site investigations can be undertaken to try and find out how much settlement is likely and the potential effect on buildings.
- Actual ground and building movement can be measured.
- The existing conditions of buildings and how they may be impacted by further settlement can be assessed.
- Footings may be designed to spread loads over weak soils, reducing potential foundation settlement.
- Compensation grouting can be used to treat ground. This technique is a commonly-used on tunneling projects, where grout is injected into the ground to firm up the area of settlement.
[edit] Related articles on Designing Buildings Wiki
- Bearing capacity.
- Brownfield land.
- Building on fill.
- Cracking and building movement.
- Defects in brickwork.
- Defects in construction.
- Defects in stonework.
- Driven piles.
- Foundations.
- Ground conditions.
- Ground heave.
- Ground improvement techniques.
- Groundworks.
- Latent defects.
- Lateral loads.
- Leaning Tower of Pisa.
- Movement joint.
- Remedial works.
- Spalling.
- Subsidence.
- Types of structural load.
- Underpinning.
[edit] External references
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.